Education.

 

Clients:

University of Queensland, Queensland University of Technology, James Cook University, Griffith University, University of Southern Queensland, DETE, and leading private schools.

 

UQ Global Change Institute Building, $32m.

Detail: This 6 Star Green Star and Living Building Challenge building has won nearly every major award in Australia , including best development in QLD (Property Council of Australia 2016) and Best Sustainable Development in Australia (Property Council of Australia 2016). The GCI building generates more energy than it consumes through extensive solar panels, geopolymer concrete structure, hydronic cooling, operable sun shading and 60,000 litres of rainwater storage. We are honored to have been trusted to build in excess of $150m in projects for UQ over the past decade. 

 

"The Miracle Project" QUT Q Block Refurbishment, $20m.

Detail: Our mum said if we put our mind to something we can achieve anything, including this $20m, 21 week refurbishment, dubbed the "miracle project".  It was an enormous undertaking , including an intensive floor-by-floor demolition and fit-out over 9 levels, plus a 150 seat capacity superlab (PC2), new main entrance, new link bridge and medical radiation service facilities. The project was a huge success for all stakeholders, with McNab having completed 5 more projects for QUT since this project.

 

UQ FIFA/FIH Sportsfields & Carpark, $21m.

Detail: Works are now complete on this two level carpark for 500 cars, complete with 15,000m2 FIFA and FIH standard sports fields on the top level, and additional building refurbishment. As one of the largest projects (by area) to be undertaken at UQ St Lucia, McNab closely managed critical items like campus disruption, safety of students and staff as well as concrete quality. Credit to UQ for their excellent video of the finished project.

 

 

James Cook University Education Central, $18m.

Detail: This award winning building provided new flexible teaching and student-centred learning spaces. Facilities include a 150-seat collaborative lecture theatre and multiple active learning spaces inside a distinctive multi-paneled facade. Many of the products used in this build were new to the Townsville market, so our focus was working closely with our subcontractors to deliver a high quality finish deserving of its outstanding design.

 

Marist College Ashgrove, multiple projects $15m.

Detail: The old saying is true in that you are only as good as your last job. Thankfully, we've delivered Marist College Ashgrove's science centre, student accommodation and aquatic centre projects ahead of schedule and budget. The college is passionate about delivering the best quality teaching and services to their students and we are very grateful to support their mission.  They also do an outstanding sports lunch each year with past graduates Matt Hayden and John Eales which is not to be missed.

 

Highfields Secondary College Expansion, Highfields $12m.

Detail: We are proud to have completed this design and construct expansion 3 weeks ahead of schedule, allowing our client considerable time to get ready for the new school year in 2017. Work was completed within the middle of the existing school grounds, and included a performing arts centre, technology building extension, staff centre, general learning areas and new kitchen building.